About 92% of Karungeli water canal works completed

The construction of a 4.3-kilometer water canal on the Karungeli River in Mimuli Sector, Nyagatare District, has reached 92% completion.

Once completed, the canal will significantly increase the volume of water flowing into the Cyabayaga Dam, which supports rice irrigation in the Umuvumba marshland.

This initiative forms part of the broader Muvumba Multipurpose Water Resources Development Program, designed to enhance agricultural productivity and food security by expanding irrigation infrastructure downstream of the Muvumba Multipurpose Dam located in the Eastern province of Rwanda

The Muvumba irrigation system, once fully operational, will cover approximately 3,073 hectares across five sectors of Nyagatare District — Rwempasha, Tabagwe, Rukomo, Nyagatare, and Karama. 

The project includes major irrigation infrastructure such as a 26.6 km right-side canal and a 43.1 km left-side canal, six booster pumping stations, 810 hectares of paddy rice fields, 2,016 hectares of sprinkler and center-pivot irrigation systems, and 75 livestock water troughs.

The Muvumba River, a transboundary river shared between Rwanda and Uganda, remains a vital water source for irrigation, livestock watering, and domestic use in the Eastern Province. 

The development of water conveyance systems such as the Karungeli canal, valued at 470 million Rwandan francs (RWF), is a key step in Rwanda’s efforts to promote climate-resilient agriculture in drought-prone areas like Nyagatare.

Community consultations have shown strong local support for the irrigation expansion, with farmers anticipating increased rice yields, improved water access for crops and livestock, and enhanced livelihoods. 

Stakeholders including the Rwanda Agriculture and Animal Resources Board (RAB) and the Rwanda Environment Management Authority (REMA) continue to provide technical guidance to ensure the sustainability, environmental safety, and long-term impact of the project. (End)